Multimodal transport of an evaporator: 120 tons / 20 x 6 x 8 m / 960 cbm from factory in Nansha (China) up to Port of Dampier (Australia) with a mandatory delivery time.
- Pre carriage by barge from factory up to port of loading
- Lashing, securring on barge at factory premises
- Coordination of the arrival of the barge and mother vessel at port of loading
- Transhipment from barge to chartered vessel
- Sea transport to Australia
Despite very difficult weather conditions (tycoon MANGKHUT), we succeeded to deliver on time.